ROAD IMPROVEMENT PROJECTS
-- Contract C1 -- [ View Interactive Project Map ]

Contract C1 encompasses approximately 1.6 miles (2,500 meters) of I-95 in the Town of East Haven. In both directions, full shoulders and a new median barrier will be constructed and new drainage, signing, and lighting will be installed.

View: Schedule Project Details [pdf 1.51MB]
  Construction Photos Photosimulations
  Status Reports
Please note: the above links will launch a new browser window.

Details of the contract are as follows:

  1. Widening I-95: I-95 will be reconstructed and widened through East Haven, between the New Haven/East Haven town line and the east shore of the Lake Saltonstall Bridge.

  2. Three lanes to Lake Saltonstall: Three travel lanes will be constructed from the eastern end of the Lake Saltonstall Bridge to the New Haven/East Haven town line.

  3. The Lake Saltonstall Bridge: No construction will take place on the Lake Saltonstall Bridge itself because it is wide enough to accommodate three lanes of traffic. It will be resurfaced and restriped.

  4. East Haven Frontage Roads: The East Haven Frontage Road system will be reconstructed and widened, accommodating additional lanes on I-95.

  5. I-95 over Route 1/Amtrak: The I-95 bridge over Route 1/Amtrak will be replaced.

  6. Laurel Street Bridge and I-95 over North High Street: Superstructure replacement and widening will take place on the Laurel Street Bridge and I-95 over North High Street.

  7. Tuttle Brook: The Tuttle Brook culvert will be replaced

  8. Farm River: The Farm River culvert will be extended.

  9. North High Street: North High Street will be widened to accommodate a turning lane onto the I-95 Northbound on-ramp.

  10. Oakley and Main Streets: The Oakley Street/Main Street intersection will be realigned.

  11. Minott Street: A cul-de-sac will be established at Minott Street.
 