Contract C2 encompasses approximately 1.0 mile (1500 meters)
of I-95 in the City of New Haven. In both directions, full shoulders
and a new median barrier will be constructed and new drainage,
signing, and lighting will be installed.
| Please
note: the above links will launch
a new browser window. |
Details of the contract are as follows:
- Widening I-95: I-95 will be reconstructed
and widened from the Woodward/Stiles Interchange
to the New Haven/East Haven town line.
- New Woodward/Stiles Interchange:
A new Woodward/Stiles interchange will
be constructed, accessible from a connector
road originating at Waterfront Street
and extending to the Fulton Terrace on-ramp.
As part of the interchange, the Woodward
Street on-ramp bridge will be replaced.
- Four Lanes to the Frontage Roads:
Between the new Woodward/Stiles interchange
and the frontage roads, I-95 will consist
of four lanes in each direction.
- Woodward, Townsend, and Forbes Ave.
Bridges: The Woodward, Townsend, and
Forbes Avenue bridges and associated retaining
walls will be replaced.
- Fulton Terrace Bridge: The Fulton
Terrace Bridge will be replaced.
- Noise Barrier at Allen Place: A
noise wall will be installed near Allen
Place along the I-95 Northbound off-ramp
to Woodward Avenue.
|
| |
|