TThe I-95 Northbound to Route 34 Westbound ‘flyover’ bridge will be constructed in advance of the proposed Q-Bridge and I-95/I-91/Route 34 Interchange construction. The new bridge will improve traffic operations in the area, as well as simplify traffic maintenance during interchange construction. To accommodate the new ramp, the Route 34 Westbound bridge over Brewery Street will be reconstructed and the Long Wharf Drive ramp at Exit 46 will be relocated approximately 1500 feet to the west.
A second lane will be added between I-91 Southbound and I-95 Southbound. To accommodate the new two-lane interstate-to-interstate connection the Sargent Drive ramp at Exit 46 will be relocated approximately 1500 feet to the west.